THE DESIGN BUILD PROCESS

In our experience the process of working with an Architect or Surveyor when

undergoing any kind of building work can best be described in a series of stages. You

may want involvement with all, or just some of these. In most cases they are

sequential and we would usually advise completion of one stage before moving to the

next which is a good way of controlling professional costs.

The stages are:

Stage 1 – Feasibility Study

Stage 2 – Planning Application

Stage 3 – A Building Regulation Application and information for construction

Stage 4 – Finding a Builder

Stage 5 – Contract Administration (Including Advice on a Suitable Contract)

Stage 6 – Post Build Services

Some of the services that The Design Studio can offer with its colleagues / associates

include:

• Architectural design

• Planning permission / building regulation approval

• Production information / going out to tender

• Helping you find an appropriate builder to carry out the work

• Obtaining competitive estimates

• Party Wall and boundary disputes

• Contract Administration / cost control services

• Planning specialist advise

• Specialist help in cost control / cost planning predictions etc.

• All forms of civil and structural engineering advice

• Specialist planning advice

Stage 1 – Feasibility Study

􀃖 What are my requirements, what do I want to build?

􀃖 What are the possibilities? Are there alternatives?

􀃖 How much will it cost?

􀃖 Will I need Planning Permission or any other consents?

􀃖 What will the planners allow me to do?

􀃖 What effect will the proposals have on the value of my property?

The feasibility study is an informal meeting and sketch based process where we work

with you to answer the above questions quickly and efficiently without incurring any

significant costs.

- 2 -

􀃖 What does this usually involve?

• Meetings and a site visit with you to discuss your requirements and explore

possibilities. Help you put together a wish list or ‘brief’. You may already have a

detailed brief to take forward, or you may just have an idea of what you would

like and an open mind to alternatives that we suggest.

• Preparation of sketch alternatives, usually hand drawn at this stage to keep costs

down.

• Informal discussions with the relevant Planning Authority to assess whether

Planning or other permissions (Listed Building Consent, for example) would be

required and their likely reaction to a formal application.

Depending on the nature of the work and degree of involvement you require a more

accurate estimation of all costs can be assessed at this stage.

Stage 2 – Planning Application

Assuming the feasibility stage has provided the right answers the next stage is a

detailed planning application. Planning permission is the Council’s way of saying,

“yes, you can proceed with the development”.

􀃖 What do the planners need to know?

Planning departments do not require any high level of technical information; they just

really want to know information like:

• What the proposed building will look like

• What the current building looks like (if it exists)

• The purpose to which the building will be put

• What the parking arrangements are.

􀃖 What information do the planners require in order to make a decision?

The Planners make a recommendation in respect of an application based on a set of

regional and national policies. To demonstrate that a proposal complies with all the

relevant polices a planning application will usually require:

• The taking of accurate information about the current site. This will often

involve a measured building or topographical (ground levels etc.) survey

which can be undertaken by one of our in-house surveyors.

• Preparation of more detailed floor plans and elevations to show how the

building will work and what it will look like. These will usually be CAD

(computer drawn) drawings… accurate information that can be altered

efficiently.

- 3 -

• Preparation of accompanying written documentation demonstrating how the

proposal complies with the relevant planning policies and information such as

how energy efficient the completed building will be.

• Depending on the nature of the proposal we will discuss with the planners to

determine whether any other information is required, such as

􀂃 An Environmental Impact Assessment (unlikely for domestic

extensions)

􀂃 A tree survey (performed by a qualified Arboriculturist, likely if there

are significant numbers of trees on the site)

􀂃 A bat, owl or newt survey (often applicable in older buildings or

buildings near water)

􀂃 A pollution assessment (if the site has, or is suspected to have any

polluted ground or materials)

􀂃 An eco / walk over desk top study.

If any of these are necessary we can arrange everything on your behalf.

􀃖 How long does the formal planning process take?

Planning permission usually takes 6 – 8 weeks from the time the application is

submitted. In order to save costs, we normally advise clients not to proceed with any

further detailed construction information or building regulations until planning

permission has been granted.

􀃖 How does the planning process actually work?

The whole process essentially works via the planners (Planning Officers) making a

recommendation to a Planning Committee of lay people (Local Councillors) based on

whether the proposal complies with their policies. In most cases, as long as a proposal

is in compliance with the relevant policies and the Planning Officer makes a positive

recommendation the chances are this will be endorsed by the Planning Committee,

but a decision can be political and the Committee can always overturn a Planning

Officer’s recommendation; this is where lobbying local Councillors can be useful if

done in a sensible way.

􀃖 What if planning permission is refused?

In some cases planning permission may be refused. In this case we will advise you on

further options which might include an Appeal. Appeals are made either by written

representations or through an informal hearing. Although planning permission

usually takes 6 – 8 weeks from the time the application is submitted an Appeal is

currently taking somewhere between 4 and 6 months from the time a refusal notice

has been issued. You can only appeal if you receive a planning refusal.

- 4 -

We may recommend the involvement of Planning Consultant or other Specialist

􀃖 For how long is planning permission valid?

Usually 3 years from the date of the approval. This time soon goes and it’s worth

making a diary note for a year after the event so you can review a way forward.

Once you have started the development (starting implies a serious undertaking such as

digging foundations or undertaking substantial demolition) work can be deemed to be

valid indefinitely, i.e. the permission doesn’t require renewing after 3 years.

Renewing an application is more complex as one has to re-apply for planning

permission providing an update of all the previous information. There is no easy way

of renewing an existing application.

􀃖 Can I still make changes once permission has been granted?

Yes, in some cases…. the Council now have a system of allowing planning

amendments provided a form is filled in and a fee (usually £25) is paid. If the

amendments involve anything other than simple window or door changes, it is likely

that a fresh application will be required which stresses the importance of getting the

initial application right in as much detail as possible.

Stage 3 - Building Regulation Application and information for construction

This is a compulsory application to the Local Authority Building Control Department

(a quite separate department), and it is designed to demonstrate that the proposed

building will be constructed in accordance with national minimum standards (the

Building Regulations). We only normally recommend applying for building

regulation approval provided planning permission is in place.

􀃖 What are the Building Regulations? What information is required for an

application?

The Building Regulations are primarily to do with Health and Safety. They cover a

large number of issues, such as ensuring that the building will be structurally sound,

ensuring that there are protections against fire with clear means of escape in the event

of fire, that the building is well insulated and thermally efficient and so on.

􀃖 What information does Building Control require?

Ensuring that the building is structurally sound is performed by a separate Structural

Engineer who will provide Building Control with a set of calculations. In our

experience a close working relationship with the Engineer is extremely beneficial. We

share premises with a firm of Structural Engineers and therefore usually involve them

informally from the very start of a project to provide suggested designs that not only

meet your requirements but are structurally efficient and sound. This can save time..

and therefore cost.

- 5 -

Most applications these days also require quite a complex thermal calculation to show

they are energy efficient. This is called a SAP calculation and we will often quote

separately for doing this.

􀃖 When can I start work?

We always recommend that approval is obtained prior to commencement of work on

site if possible. This usually takes around 6 weeks from the time of submission until

approval. You are entitled to start the work before full approval is granted once a

building regulation application has been submitted and acknowledged but this must be

‘at your own risk’. The Council retains the right to come back and request more

information or changes, which could be difficult if the work has been started.

Our quotations for obtaining building regulation approval are for just that, at this stage

we do not get actively involved on site or provide any further information other than

that which is necessary to obtain building regulation approval. We’d be happy to

provide further help such as full construction information / drawings and contract

administration. These are covered under later stages – see below.

So what is the difference between building regulation information and construction

information?

Building regulation information purely provides information to sow compliance with

the building regulations. It doesn’t need to cover for example:

• Detail setting out information, i.e. setting out dimensions for construction

purposes

• Detail specifications for interior finishes such as floor finishes, wall

finishes etc.

• Decorations

• Type of kitchen installation, bathroom, sanitaryware details

• Larger scale drawings showing how wall connects to the roof or the wall

connects to the floor and to the ground.

At the back of this document, we have shown a typical detail that would normally

satisfy Building Control. The same drawing is taken into further detail to allow

for construction…. spot the difference!

To some degree, the extent of detailed information required will depend on the

experience of the builder undertaking the work. Construction information also

helps to eliminate risks and, in most cases, the cost of preparing this information

is more than justified by the tendering exercise… based on full information as

opposed to basic building regulation compliant information.

Stage 4 – Finding a Builder

How do I find a builder? This is a really valuable part of the service that we can

offer. We have nearly 30 years experience in matching builders to clients and their

- 6 -

projects. We work with a number of contractors both small and large. We monitor

trends in prices and tend to know what a particular builder is good at doing. Builders

with whom we work regularly tend to look after our clients for obvious reasons!

What are the advantages of competitive tendering:

• Provided one approaches builders of appropriate experience, generally 4 or

5 on a job of an average size, prices received will be typically wide ranging.

For example, on a job of a contract value of £225,000 one could be

receiving tenders below £200 and approaching nearly £300.

• If an accurate specification and detail drawings and prepared, this will

inevitably lead to a more accurate tender / estimate.

• In other words it is up to the builder how he interprets the requirements, how

he prices the work required and who he approaches by way of subcontractors

and building suppliers. It will also depend on the builder’s

infrastructure, i.e. has he got a yard, has he got offices, has he got contract

managers; lots of factors will effect the approach.

• We check priced documents on receipt of tenders and prepare a tender

analysis advising on the tenders received. We will then advise you on the

type of building contract which is appropriate to your project.

Should I use a building contract? Yes! it covers in detail the essential parts of the

agreement such as payment, retention, insurance, an incentive to finish the project /

damages etc.

Stage 5 - Contract Administration / Cost Control Services.

What does this involve / do I need it? Typically the following will be included as part

of the above services:

• Attending pre-contract site meeting with chosen contractor to discuss

programme organisation.

• Preparation of contract documentation. Arranging for signing of contract

documents by both parties. Supplying all necessary information to contractor.

• Setting up project page on website with private password for access to

drawings, cost schedules and minutes.

• Checking contract programme of works. Monitoring the process and the

quality of work by periodic site visits.

• Preparing monthly reports to you on progress and actual contract expenditure.

Administering the terms of the building contract during progress of the works.

• Assessing valuation application submitted by the building contractor, issuing

valuation certificates on your behalf. Preparing and updating a draft final

account. Agreeing a final account with contractor and handing over record

drawings.

Management of the project on site is usually carried out by the Contractor’s Contracts

Manager who is able to control sub-contractors, resources and his build team. Some

- 7 -

people mistakenly think that an Architect or Surveyor fulfils a management of the

project on site role. This is not the case as they are not there all day every day

carrying out typically visits only once every 2 or 3 weeks depending on the stage at

which the project is at.

Stage 6 – Post Build Services

What happens beyond completion of the project?

We can help you set up a building maintenance manual to cover not only the new

work but the existing building. This will include general advice on maintenance.

We can do an energy audit, in most cases we will have done calculations in relation to

the new work. If this is an extension to an existing building, we can look at the whole

building complex and advise on energy consumptions and ways in which these

consumptions could be reduced.

We can prepare a Building Manual to include ‘as built’ drawings etc.